Yesterday, the dish was placed on the meter high pole on the roof. The cabling was then ran down through the new trunking and into our cab.

The power to the stratex eclipse was also connected. It runs at low voltage to the PSU. This is done to allow none electrical certified engineers work on it.

Once the hardware was powered up, a multimeter was used to test signal strenght to three rock. Once this best signal strength was found, the eclipse was tested from both ends.

Apologies no pictures yesterday, will have some tomorrow!